Comment
Planning Obligation - A Guide to Section 106 and Developer Contributions
Representation ID: 321
Received: 07/01/2010
Respondent: Environment Agency
Representation Summary:
Appendix 1, page 37 - This section should include reference to the Essex Thames Gateway Water Cycle Study Scoping Report 2009. Further iterations of this document should also refer to the detailed Water Cycle Study report currently being undertaken for your Local Authority by Scott Wilson and also the updated Strategic Flood Risk Assessment.