Policy DM15 - Environmental Protection

Showing comments and forms 1 to 4 of 4

Object

Development Management - Proposed Submission

Representation ID: 1172

Received: 20/04/2011

Respondent: Environment Agency

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The DPD has not considered the foul water infrastructure and water quality issues identified in the Water Cycle Study.

The Southend Water Cycle Study (Scoping Report, March 2009) identifies that the Southend Wastewater Treatment Works does not have the capability to treat further wastewater flows as a result of an increase in development. This may have a detrimental impact on water quality, nature conservation and the environment, which would contravene policy and objectives. Therefore, a policy is required to ensure that the impact of new development on foul water infrastructure and water quality is considered.

Full text:

The Development Management DPD has not currently given any consideration to the capacity of foul water infrastructure in the Borough or the impact of growth on water quality. We therefore consider the plan is unsound as it is not justified, effective or compliant with national policy.

The Council completed a Water Cycle Study (WCS) scoping study in March 2009 which identified the 'Southend Wastewater Treatment Works (WwTWs) is currently at capacity and therefore does not have the capability to treat further wastewater flows as a result of increase in development' (table 5.1). The works discharge to the Thames Tideways which are designated SPA, SAC, RAMSAR and SSSI. The quality of discharge into this environment must not result in the deterioration of water quality under the Water Framework Directive, Habitats Regulations Directive, Bathing Waters Directive and Shellfish Waters Directive.

The WCS also identified that in some areas of the Borough any increase in flows through the network is 'likely to cause an increase in the frequency of diluted but untreated discharges' into the Thames Tideway (table 5.1). As with the WwTWs, this has the potential to compromise meeting the objectives of the Water Framework Directive, Habitats Regulations Directive, Bathing Waters Directive and Shellfish Waters Directive. Although not specifically identified, it can also be expected that there could be local surcharges in the system which would lead to local flooding and pollution incidents.

The scoping study does not consider the options, viability or timings associated with upgrading the infrastructure and consequently it advises further investigation is required. Southend Borough Council have commissioned a detailed WCS and aimed to publish the draft in May 2010 however we understand this has been significantly delayed. Whilst the detailed WCS needs to be completed as soon as possible to provide information on how and when the issues will be address, it is clear from the information within the scoping report that a policy is required to ensure the impact of new development on foul water infrastructure and water quality is considered. Not considering these issues in the planning process could not only result in a failure in Water Framework Directive, Habitats Regulations Directive, Bathing Waters Directive and Shellfish Waters Directive targets, but it would conflict with other aims of the Councils LDF such as protecting international and national sites for nature conservation and promoting tourism.

The Sustainability Appraisal (SA) does not appear to have assessed or considered water quality issues associated with foul drainage. Whilst we note that objective NR2 of the Sustainability Appraisal is 'to maintain and improve the quantity and quality of ground, sea and river waters, and minimise risk of flooding', only policies DM2 and DM16 are rated as 'likely to contribute to the achievement of greater sustainability according to the likely objective'. This however relates to the aspect of the objective requiring improvements to water quantity, not quality. For the majority of policies in the Development Management DPD, this objective is rated as 'no identifiable relationship between the topic covered in the policy and the sustainability concern'.

The importance of ensuring there is adequate infrastructure is recognised by national planning policy. Planning Policy Statement (PPS) 1: Delivering Sustainable Development states that there is a requirement to base policies on a 'recognition of the limits of the environment to accept further development without irreversible damage' (paragraph 19). Furthermore, the PPS 1 Supplement: Planning and Climate Change states that in selecting land for development, consideration needs to be given to the 'capacity of existing and potential infrastructure' with specific mention of sewage and sewerage (paragraph 2.4). PPS 12: Local Spatial Planning (paragraph 4.8) requires Local Planning Authorities to support policies with evidence of the infrastructure requirements required to facilitate proposed development.

Attachments:

Object

Development Management - Proposed Submission

Representation ID: 1176

Received: 20/04/2011

Respondent: Environment Agency

Legally compliant? Yes

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Concern with some of the wording relating to contaminated land. A condition should only be applied where appropriate and any remediation works should be carried out before commencement of any new development.

Full text:

We must currently find policy DM15 unsound as it is not consistent with national policy set out in Planning Policy Statement 23: Planning and Pollution Control.

Whilst we welcome this policy which will protect controlled waters on sites affected by contamination, we draw your attention to the requirement of point 1iii. This part of the policy states that 'remediation works will be carried our before the occupation of any new development'. It is not however always possible for such works to be carried out at this stage of the development as buildings and other infrastructure on the site may prevent the required works from taking place.

We would also query the wording of point 1ii. Whilst point 1i requires applicants to submit contaminated land assessments with their application to establish any risks on the site, it may not always be appropriate to condition remedial works. This is supported by paragraph 2.44, 2.55, 2.60 and 2.61 of PPS23 annex 2.

Object

Development Management - Proposed Submission

Representation ID: 1200

Received: 02/06/2011

Respondent: Natural England

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

In the absence of the additions to Policy DM15 and its supporting text , as recommended by the Environment Agency in their response dated 20 April 2011, there is a Risk that development might have a significant effect on the Benfleet and Southend Marshes SPA and RAMSAR site.

Full text:

Natural England considers that the Development Management DPD (proposed submission) is currently unsound. The reason for this view is that we consider that
in the absence of the additions to Policy DM15 and its supporting text , as recommended by the Environment Agency in their response dated 20 April 2011, there is a Risk that development might have a significant effect on the Benfleet and Southend Marshes SPA and RAMSAR site. However Natural England are also of the opinion that this issue can be resolved by the inclusion of the additions to Policy DM15 and its supporting text, as recommended by the Environment Agency in their response dated 20 April 2011.

Comment

Development Management - Proposed Submission

Representation ID: 1436

Received: 20/03/2012

Respondent: Southend Borough Council

Representation Summary:

Halcrow's recent advice whilst developing a Cliffs Management Strategy changes the circumstances quite significantly and I consider there is now a strong reason to make changes to the document as follows:

Full text:

Whilst I worked with officers on the original policy wording for Policy DM15, Halcrow's recent advice changes the circumstances quite significantly and I consider there is now a strong reason to make 'focussed' changes to the document as follows:


Suggest we re-word DM15.2 thus:-
"All development proposals in the vicinity of the cliff frontages shall take full account of the risk of ground instability. The Council is developing a Cliffs Management Strategy which will include location specific guidance to developers on areas which the Council consider unsuitable for development and those which require mitigation works to facilitate development. Pending issue of this strategy, potential developments should be discussed with the Council at an early stage to establish the suitability of the proposal. Development that is at risk from land instability or that is likely to increase risk to the site or surrounding areas will not be acceptable. Proposals will only be considered where:-

(i) It has been demonstrated to the satisfaction of the Council that the development of unstable or potentially unstable land will be constructed and used safely without increasing instability in the site or surrounding land
(ii) It can be demonstrated that mitigation measures to stabilise land are environmentally acceptable and will not adversely impact upon neighbouring uses."

Attachments: