Two projects have been identified (currently at inception stage) that may potentially be advanced within the forthcoming Local
Plan period and that are necessary to meet the needs of the population.
The first is the relocation of St Luke's Healthcare Centre to provide a permanent facility capable of meeting the demand (which it currently is unable to achieve due to its size and temporary accommodation nature). The second is to completely redevelop the Shoebury Health Centre at Campfield Road, which is in a poor state of repair to an extent that refurbishment is not a viable option.