As a result of these concerns we do not believe that the Council has demonstrated that the proposed rates are viable and will not threaten the delivery of the Plan. We have subsequently prepared the following representation, which looks at the following:
* Section 1 Is the DCS supported by background documents containing appropriate available evidence?
* Section 2 Are the proposed rates informed by and consistent with the evidence on economic
* Section 3 Has SSBC provided evidence that shows that the proposed rates would not threaten delivery of the relevant Plan as a whole?
* Section 4 The Effective Operation of CIL