Comment
Southend Central Area Action Plan
Representation ID: 719
Received: 09/08/2010
Respondent: Renaissance Southend Ltd
Representation Summary:
As above; need to know the potential before a policy can emerge. Most of the investment required for these systems is in the main distribution network rather than what happens on site.
Full text:
As above; need to know the potential before a policy can emerge. Most of the investment required for these systems is in the main distribution network rather than what happens on site.