Southend Central Area Action Plan & Proposals Map - Proposed Submission

Ended on the 17 October 2011
For instructions on how to use the system and make comments, please see our help guide.

Appendix 3


Schedule of housing capacity within SCAAP

SCAAP Quarter Completions
2001-2010
Windfall Sites with Planning Permission @ 2010 Capacity on Identified in SHLAA 2008 base date Indicative capacity
1. The High Street 13 97 333 143
2. Queensway and London Road 1 0 150 151
PS2a 150
3. Elmer Square 8 5 0 13
PS3a
4. Queensway and Southchurch Road 11 8 50 69
PS4a
5. Warrior Square 10 17 120 147
PS5a 2 2 120
PS5b
6. Clifftown 53 4 1004 157
PS6a 38
PS6b 57
7. Tylers 5 0 80 85
PS7a 80
PS7b
8. Central Seafront 331 0 10335 1,364
CS6a -
CS6b 8006
CS7a
CS8a
9. 'Victorias' Gateway Neighbourhood 174 24 8197 1,017
PS9a 3378
PS9b 30
PS9c 272
10. 'Sutton' Gateway Neighbourhood 288 11 141 440
PS10a 09
PS10b 14110
PS10c
Total 894 166 2,526 3,58611

Notes:

3 Comprises two sites now with planning permission at 2010
4 Includes 5 units on SHLAA Site Ref CON029
5 Includes SHLAA Sites Ref CON059, CON121 and CON120 plus CON020 and CON004
6 Sum of SHLAA Sites Ref CON059, CON121 and CON120
7 Sum for this area includes additional SHLAA sites in the Neighbourhood outside PS9a,PS9b and PS9c
8 Sum of SHLAA Sites Ref CON042, and CON104
9 SHLAA Site CON049 approval for retail superstore only residential not now included within scheme
10 Sum of SHLAA Sites Ref CON117, CON122 and CON052 – however area of proposal site now greater therefore likely capacity will be higher
11 Adequacy of housing supply: Core Strategy Provision (2001 – 2021) = 2,000. Annual development rate = 100 pa; Completions 2001-2010 (9 years) = 894 (99 pa).
SCAAP roll forward 15 year requirement (2011 – 2026) = 1,500 (15 x 100pa). Identified Indicative Capacity within SCAAP 2,692
For instructions on how to use the system and make comments, please see our help guide.
back to top back to top